Wednesday, May 4, 2011

Framing Continues


Framing continues apace, even as I'm out of town.  Dormer for the second floor bedrooms and bath is complete with the roof, and the new porch is taking shape too.  Interior stairs to the lower level have been built, and the bedrooms are framed inside as well.  Photos to follow at some point when I'm back in town.

I hear that some pruning went on out the window on the far side of this -- glad I wasn't there as it's basically three stories straight down! 

This weekend promises to be a flurry of packing.  I can feel my back muscles tensing already.

1 comment:

  1. Wow! What progress! I just looked at a map of Concord Conservation areas, and I think I could walk to your house on the RR trail to the Rifle Range. I'll have to figure that out!

    ReplyDelete